As previously mentioned the Add a New Model Layer, The layer is added based on what parameters are being modeled, what data has been loaded, and what option has been requested at a particular time by the userwhen add a parameter layer to the 2DH View, the user have to select the Primary Group then select the Parameter which belongs to the Primary Group above. All of the available options primary groups are described below.
- Cell Indexes
- Cell MapModel Grid
- Bottom Elev
- Water Levels
- Boundary Conditions in ViewPlan
- Fixed Parameters
- Model Metrics
- Velocities
- Sediment Bed
- SEDZLJ Option
- Toxics
- Bed Processes
- Heat: Bed/Ice
- Water Column – by Layer and by Depth
- Sediment Diagenesis/Specified Fluxes
- Vegetation Map
- Internal Variables (EFDC+ Only)
- ModChannel
- Wave Parameters
- Volumetric Analysis
- 2D Contour Lines
- Time Series Contours
- High and Low Pass Filter for Time Series
- Mean Mass Transport - Averaging of 2D & 3D fields
- Particle Tracks and Oil SpillLevel
- Boundaries
- Hydrodynamics
- Model Metric
- Water Column
- Thermal / Ice