Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

In the General tab, the user selects the last bottom option as shown in Figure 1. This option, erosion rate will base on equation E = A*Tau^N with A (Erosion Multiplier), N (Erosion Exponent) elements and Bed Properties Using. A and N will be defined in Erosion Rates tab as shown in Figure 3.

When the erosion rate option 3 is selected, the Assign Bed IC button is enable, click on the button, a form of Initialization of Sediment Beds appears as shown in Figure 2. The user can refer to Sediment Bed Construction section for more details.

Figure 1  Erosion Rates Option 3 - General tab.

Figure 2  Erosion Rates Option 3 - Initialization of Sediment Bed.

Figure 3  Erosion Rates Option 3 - Erosion Rates tab.


  • No labels