Insufficient observed data for inflow or outflow when establishing your reservoir can lead to unsatisfactory validation results when comparing observed water levels with those calculated in the model. In such situations, the Reservoir Water Balance tool proves valuable. It relies on the difference between observed and calculated water levels to generate a balanced inflow time series. Subsequently, utilizing this time series can result in significantly improved validation results.

The Reservoir Water Balance tool can be selected from the Tool Tools menu, as shown illustrated in Figure 1.

...

Image Removed

Figure 1. Generate DEM.

Once the option is selected, the Generate DEM form will appear as shown in Figure 2. From this form, the user can click on Add File then browse to the digital elevation data file (terrain*.xyz) from the Data folder. Once loaded, the coordinates of the Lower-Left and Upper-Right points will be updated as well as the Cell Size and Number of Cells, the user can change the Cell Size then click on the Calculator symbol to update the Number of Cells and vice versa. The more cells the higher resolution of the DEM file. The output format for the generated DEM files is TB2, click the Generate DEM button to start generating DEM file.

...

Image Removed

Figure 2. Generate DEM Form.

Once, the Generate DEM button is selected, the Export DEM form is displayed as shown in Figure 3. Enter a name in the File Name (e.g DEM), select the folder directory to store the file then click Save button as shown in Figure 3.

...

Image Removed

...

The Water Balance form will then be displayed. In this form, Timing Options can be configured or left as default.

In the Update Series options, choose a time series station that will be used to balance the water levels. This is shown in Figure 2 below, where the series Balance P has been selected. After selecting this time series station, a Control Water Level series should be chosen to serve as the observed water level. Please note that the import file for the Control Water level must be in the correct format (see Figure 1). When the Compute button is selected, a notification indicating successful computation will appear.


Image Added

Figure 1. Reservoir Water Balance

Selecting a Time Series and Location

Before using the Reservoir Water Balance tool, it is necessary to have a time series for the water balance data, as shown in Figure 2. A new data series can be created, or an existing time series can be chosen. A new data series was created and named "Balance P" in this example.

After this step, the location to input the balance time series must also be configured. The location in the model domain should be selected and set as a new boundary group, as shown in Figure 3. The flow series must then be assigned, as shown in Figure 4. When the model is next run, EE will use the Balance P time series to ensure that the water level stays at the level selected as the Control Water Level.

Image Added

Figure 2. Time series for providing water balance. 


Image Added

Figure 3. The Location of the water balance time series


Image Added