Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

If the HS uses an equation then the View Cell Time Series and View Group Time Series options are enabled as shown in Figure 2. An example of how to use these options is provided below. 
If editing is enabled when the user RMC's on a cell, the menu (shown adjacent) is displayed. The user can choose:

Edit                             To edit the boundary group.

...


EE8 has the capability to plot the flow time series of an actual boundary condition including hydraulic structures defined by equations. efdc+ creates a new output file, EE_BC.OUT that stores the flows for each boundary condition / cells at each time step. The user can now RMC on any BC in a model that has model output loaded and see the time series of flow.

 


An example of how to view the time series is shown in Figure 3. This model has an open (tidal) boundary at the western boundary and an open (tidal) boundary in the eastern boundary. A culvert has been configured in the middle of the domain, with the upstream cell of the culvert marked with a "U" and the downstream cell marked with a "D". The downstream (D) cell for the culvert has been RMC'd and the user can now select a look-up table or time series. If the culvert does not use a look-up table this option is not available. In this case the culvert has a time series for flow which will be displayed as shown in Figure 4.

...